Report calculating elapsed time (S.O.S) in LabVIEW General Posted June 21, 2007 Hi, I have a problem in calculating the time difference between 2 events. Can any one see the attached VI because the difference is not correct. Thanks in advance.
calculating elapsed time (S.O.S)
in LabVIEW General
Posted
Hi,
I have a problem in calculating the time difference between 2 events.
Can any one see the attached VI because the difference is not correct.
Thanks in advance.