Mike Ashe Posted March 23, 2004 Report Share Posted March 23, 2004 When you close a VI with subVIs you will often be asked if you want to save "such-n-such" VI. When you click on the Explain button you get a dialog that tells you that a subVI, etc has changed locations _or_ its connector/front panel. You are then told to check the VI to make sure that the connector is still wired correctly, but they don't give you the list of changed VI(s). In a 2 VI project this is no problem, but most of us work in the dozens at a minimum and hundreds of VIs routinely. How about a list of changed VI(s) :headbang: Quote Link to comment
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.