Jump to content

Time and Task scheduling


Neha

Recommended Posts

Facing a problem to develop logic for Load Scheduling. Actually, I have done Load prioritization based on criticality of load requirement. Basically, problem is that I need a clock that read real time and that time is need to be compared with the schedule I have set, I m not able to sync the clocks, the output of the clock on comparison will switch on Diesel engine for particular load. Suppose load A is required for time 08:00 to 12:00 supplied by grid supply if grid supply isn’t there then diesel engine , same diesel engine supply to load B which is required to run at 14:00 to 20:00 hr.

I hope I made my problem clear.

Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Unfortunately, your content contains terms that we do not allow. Please edit your content to remove the highlighted words below.
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.