Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 12/02/2012 in Posts

  1. One way to do this is to use the picture functions and the "Plot Images" property of the graph to draw rectangles of different colours on the graph.
    1 point
  2. To easily convert the time string to a time stamp, create a time stamp control with the same formatting as the time string. Then wire the time string value to the property Numeric Text>Text of the time stamp. It is like copying the string into the control. LabVIEW convert the value automatically. :thumbup:
    1 point
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.