Hi,
I have the following question: It is possible to insert a subvi in a block diagram through vi scripting, but How can you connect a wire that already exsists and has several junctions at the correct location? eg: a string control connected to 2 (arbitrty) string functions, and you want to insert a function just after the string. As far as I can see a wire with all its junctions is threated as 1 object and then this would not be possible. Is this correct?
thanks,
JBS