  1. Natu

    Delay Timer

    QUOTE(JFM @ Feb 4 2008, 06:26 PM) Since I am making One Operator Training Simulator (OTS) for Tharmal Power Plant with the help of LabView. In which there will be number of Systems. And each System will have number of equipment like Pump, Valves, Tanks etc. So for each system I will make One SubVI where all the operation seqence and control logic will be implemented and here I will give some time delay to fulfill the requrement. And each subVI which is representing a corrosponding System, I will call in MainVI to reduce the over all VI size. Now as you are asking for MainVI it is very difficalt to send. Thats way I had simlified my question. And what I am understanding as Mr. JFM is telling it is not possible to set some SubVI property to satisfy my requirement. So I am manipulating like shown in attachment.
  2. Natu

    Delay Timer

    QUOTE(martin@aerodynamics @ Feb 1 2008, 12:34 PM) Thanks for reply Mr. Martin I am very sorry I am late because my PC is hanging frequenty because that only by mistake I sent my question in two categories. I am attaching three Flash Generator with differenet timing. When I am calling these, in main VI it is not flashing LED with the frequency what I have discided while making. Whereas individually it is working.
  3. Natu

    Delay Timer

    I have made some subVI with "while loop" and wih "time delay" with different differet mill seconds and if i am calling these subVI in Main VI here also i have given "time delay". But subVI are not executing with time delay what i have given while making that subVI. Please help me, how I can set "subVI property" so it should execute with its own time delay in "main VI".
  4. Natu

    Delay Timer

    I have made some subVI with "while loop" and wih "time delay" with different differet mill seconds and if i am calling these subVI in Main VI here also i have given "time delay". But subVI are not executing with time delay what i have given while making that subVI. Please help me, how I can set "subVI property" so it should execute with its own time delay in "main VI".
  5. Natu

    RS flip-flop

    QUOTE(Tim_S @ Jan 20 2008, 07:20 PM) Thanks I got it. Now it is working. It took 3 days.
  6. Natu

    RS flip-flop

    Mross and Tim_S First of all thanks for prompt response from your side. since i am going to make one operator training simulator (OTS) for power plant, based on the labview. To implement the logic for pump, valve etc. I need very much this set reset Flip-Flop. And I have already made one set reset Flip-Flop attached here. But problem is that I can used that saved set reset Flip-Flop only once. If I will use second time this same set reset Flip-Flop by copy and paste method then both will work together, but not independently. I have made same as a SubVI but problem still same I can not use more than one place. That's why I was asking a method by which I can use self made set reset Flip-Flop any number of time independently same way as we are using other function palette elements like AND, OR, NOT gates.
  7. Natu

    RS flip-flop

    I want to make RS flip flop and then i want to use that flip flop same as we are using Logic Gates from Function Palette. Please give the Idea.
  8. Natu

    RS flip-flop

    I want to make RS flip flop and then i want to use that flip flop same as we are using Logic Gates from Function Palette. Please give the Idea.
  9. Natu

    RS flip-flop

    I want to make RS flip flop in labview, and I want to use this like Logic Gates etc are used from function palette.
  10. Natu

    RS flip-flop

    I want to make RS flip flop in labview, and I want to use this like Logic Gates etc are used from function palette.
×
×