RaviPaike Posted October 19, 2005 Report Share Posted October 19, 2005 Hi Guys, PLz help me with this, my problem is when i switched to RT it errors out saying " error code 56:The network operation exceeded the user-specified oy system time". I ma using labview 71, simulation tool kit 2.0.2 and labview RT 7.1 Nowrmal desktop simulation runs ok but as soon as switched to RT target I get this error. plz guys help me out.. Thanks in advance Ravi Quote Link to comment
william wallace Posted October 20, 2005 Report Share Posted October 20, 2005 Hi Guys,PLz help me with this, my problem is when i switched to RT it errors out saying " error code 56:The network operation exceeded the user-specified oy system time". I ma using labview 71, simulation tool kit 2.0.2 and labview RT 7.1 Nowrmal desktop simulation runs ok but as soon as switched to RT target I get this error. plz guys help me out.. Thanks in advance Ravi Hi Raviļ¼ That's only a timeout error.You try the following step to see if it is helpful. 1.Make sure that the LAN work all right. 2.Amend the "timeout" property to make sure that your operation can contain the net delay. Best regards william Quote Link to comment
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.